Article
Publication date: 7 April 2023

Rebeca Lambers, Fiona Lamari, Martin Skitmore and Darmicka Rajendra

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study…

Abstract

Purpose

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study aims to propose a new method for identifying a bespoke checklist of the most recurrent defects in residential construction work and their correlated causes as a basis for developing a framework for practical improvements in managing defect risks.

Design/methodology/approach

A literature review was first used to ground the defects within the existing theory and develop a new framework for ranking the key defects involved. This was demonstrated and tested by an analysis of Queensland Building Construction Commission (QBCC) archival data for 42,000 reported defects in new Queensland residential buildings. A questionnaire survey of 427 construction practitioners from 37 trades was then conducted to determine their causes.

Findings

The developed framework consists of preconditions for defective acts, defective supervision and organizational influences and is found to be suitable for analyzing the QBCC archives to rank the 20 most frequent defects. In the demonstration study, a questionnaire survey identified the highest frequency latent causes of defective acts to be workers taking shortcuts to complete tasks, workers’ lack of skill or knowledge level, challenges and limitations of technical constructability, and incorrect material supply; the failure to correct a known problem and poor supervision for defective supervision; and inadequate employee training, low managerial priority for quality and high time pressure and constraints for organizational influences.

Originality/value

The method is a new approach to identifying the key defects in residential construction work and their correlated causes for developing bespoke checklists as an aid to in managing defect risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 July 2022

Sushilawati Ismail, Carol K.H. Hon, Philip Crowther, Martin Skitmore and Fiona Lamari

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been…

Abstract

Purpose

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been used for commercial building projects, its application to sustainable infrastructure development has been limited to date. This study aims to examine the drivers and challenges involved.

Design/methodology/approach

A preliminary conceptual framework was initially developed based on a systematic literature review. Semi-structured interviews involving 20 participants were undertaken to gain insightful thoughts from the construction practitioners to discover the perception towards IBS application in the construction industry, the applicability of IBS, particularly in infrastructure projects, the strategies of IBS delivery and the sustainable potential of its application. A two-round Delphi study was conducted with 15 experienced and knowledgeable panellists to further identify, verify and prioritise factors developed from the literature review and interview findings. Then, the results were synthesised and triangulated to demonstrate a holistic insight.

Findings

The results show the main drivers to be better productivity, quality, environmental, safety and health, constructability design and cost, policy and requirements, with the main challenges being project planning and cost-related issues, inexperience and industry capacity.

Originality/value

The study’s main contribution is in systematically determining the practical implications involved in applying the IBS to sustainable infrastructure developments in Malaysia and other similar developing countries.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 November 2020

Ammar Moohialdin, Fiona Lamari, Marc Miska and Bambang Trigunarsyah

Hot and humid climates (HHCs) are potential environmental hazards that directly affect construction workers' health and safety (HS) and negatively impact workers' productivity…

Abstract

Purpose

Hot and humid climates (HHCs) are potential environmental hazards that directly affect construction workers' health and safety (HS) and negatively impact workers' productivity. Extensive research efforts have addressed the effects of HHCs. However, these efforts have been inconsistent in their approach for selecting factors influencing workers in such conditions. There are also increasing concerns about the drop-off in research interest to follow through intrusive and non-real-time measurements. This review aims to identify the major research gaps in measurements applied in previous research with careful attention paid to the factors that influence the intrusiveness and selection of the applied data collection methods.

Design/methodology/approach

This research integrates a manual subjective discussion with a thematic analysis of Leximancer software and an elaborating chronological, geographical and methodological review that yielded 701 articles and 76 peer-reviewed most related articles.

Findings

The literature included the physiological parameters as influencing factors and useful indicators for HHC effects and identified site activity intensity as the most influencing work-related factor. In total, three main gaps were identified: (1) the role of substantial individual and work-related factors; (2) managerial interventions and the application of the right time against the right symptoms, sample size and measurement intervals and (3) applied methods of data collection; particularly, the intrusiveness of the utilised sensors.

Practical implications

The focus of researchers and practitioners should be in applying nonintrusive, innovative and real-time methods that can provide crew-level measurements. In particular, methods that can represent the actual effects of allocated tasks are aligned with real-time weather measurements, so proactive HHC-related preventions can be enforced on time.

Originality/value

This review contributes to the field of construction workers' safety in HHCs and enables researchers and practitioners to identify the most influential individual and work-related factors in HHCs. This review also proposes a framework for future research with suggestions to cover the highlighted research gaps and contributes to a critical research area in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 July 2019

Ammar Saeed Mohammed Moohialdin, Fiona Lamari, Marc Miska and Bambang Trigunarsyah

The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially…

Abstract

Purpose

The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers.

Design/methodology/approach

This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs.

Findings

Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs.

Originality/value

The comprehensive literature review makes an original contribution to WP measurements filed in HHWCs in the construction industry. Results of this review provide researchers and practitioners with an insight into challenges associated with the measurements methods and solving practical site measurements issues. The findings will also enable the researchers and practitioners to bridge the identified research gaps in this research field and enhance the ability to provide accurate measures in HHWCs. The proposed research framework may promote potential improvements in the productivity measurements methods, which support researchers and practitioners in developing new innovative methods in HHWCs with the integration of the most recent monitoring technologies.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 February 2024

Laura Gutierrez-Bucheli, Jian Tsen Goh, Ali Rashidi, Duncan Maxwell, Ross Digby, Yihai Fang, Henry Pook and Mehrdad Arashpour

In the realm of construction education, the investigation of immersive learning and extended reality (XR) technologies has experienced a surge in recent times. Nevertheless, there…

Abstract

Purpose

In the realm of construction education, the investigation of immersive learning and extended reality (XR) technologies has experienced a surge in recent times. Nevertheless, there remains a notable lack of comprehension surrounding the most efficient ways to integrate these technologies into tailored teaching approaches for vocational construction training. This research study aims to pinpoint the key factors that construction vocational education and training (VET) providers must consider when introducing XR technologies into their training schemes.

Design/methodology/approach

This study conducted an in-depth literature review to develop an initial framework to summarise training, technology and institutional factors influencing the educational-technology integration of XR technologies in VET. In addition, this study utilised a Delphi technique, including semi-structured group discussions and two rounds of online follow-up questionnaires, to capture VET experts’ judgements on the importance of decision-making criteria.

Findings

This study has identified the critical factors to be considered in the VET sector when adopting XR technologies. Findings revealed institutional factors were the most important criteria for participants, followed by training and technology factors.

Research limitations/implications

The current decision-making process focuses on selecting XR technologies rather than evaluating their performance after implementation. Therefore, more research is needed to monitor the implementation of this technology in curricula from a senior management perspective. This will help to understand the cost and value factors related to the value proposition of XR technologies in courses.

Practical implications

To ensure the success and long-term viability of the technology-curriculum interface, it is important to consider factors such as the availability of technical and educational support, data security and cost-effectiveness. It is also crucial to focus on ease of use and content development that emphasises instruction to create engaging content for learners.

Originality/value

The potential impact of this study is underpinned by two facts: (1) it constitutes the first effort made in the field to comprehensively elicit VET expert judgements in relation to XR technologies, and (2) it offers decision-making criteria that are at play in seeking to take advantage of high-cost technologies that are rapidly evolving. While there is no simple checklist for XR implementation, this study takes a step further to identify significant factors influencing XR integration in vocational construction training.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Book part
Publication date: 2 May 2013

David J. Boyd

Purpose – Present a history of interaction (1947–1996) between a remote nonmarket rural economy in the Papua New Guinea (PNG) highlands and capitalism, first via colonialism and…

Abstract

Purpose – Present a history of interaction (1947–1996) between a remote nonmarket rural economy in the Papua New Guinea (PNG) highlands and capitalism, first via colonialism and then in the post-Independence period. The Irakia Awa sought to create an alternative local version of modernity in a context of limited opportunities for participation in the monetized market economy.Design/methodology/approach – Ethnographic, multi-temporal field research, totaling two years in residence, focused on sociocultural changes associated with reallocations of land and labor to cash-cropping (coffee), wage labor migration, and new place-based cash-generating initiatives.Findings – After more than three decades of intensive participation in labor migration, the most lucrative option available for earning cash, Irakians deemed it futile, as well as detrimental to the overall well-being of their home community. They dramatically reduced labor migration levels, increased smallholder coffee production, and set about creating a more modern and inviting village lifestyle.Research limitations/implications – This is the historical experience of one rural community in the remote PNG highlands up to the mid-1990s, but is framed around ongoing issues confronting many rural communities engaging with capitalism in PNG.Originality/value – This account presents original field research and contributes to the growing literature on PNG rural peoples with limited opportunities to participate in the cash market economy within a larger context of government policies and malfeasance that have rendered many rural communities largely “invisible.” It suggests substantial reforms are needed before all citizens can enjoy benefits from engaging with capitalism.

Details

Engaging with Capitalism: Cases from Oceania
Type: Book
ISBN: 978-1-78190-542-5

Keywords

1 – 6 of 6